Driveway Gate Planning Permission in London
Most driveway gates in London are taller than the height allowed without planning permission, so it pays to check before you order. Below is how the national rules work, what changes in conservation areas and on listed buildings, and the official planning resources for each London borough.
Choose your council
These guides link to council resources. They do not classify a whole borough as permitting or prohibiting gates. If your council is not listed, use the official council finder.
Barnet
Property checks and council resources →Bromley
Property checks and council resources →Camden
Property checks and council resources →Croydon
Property checks and council resources →Ealing
Property checks and council resources →Enfield
Property checks and council resources →Greenwich
Property checks and council resources →Hackney
Property checks and council resources →Hammersmith and Fulham
Property checks and council resources →Haringey
Property checks and council resources →Harrow
Property checks and council resources →Hillingdon
Property checks and council resources →Hounslow
Property checks and council resources →Islington
Property checks and council resources →Kensington and Chelsea
Property checks and council resources →Kingston upon Thames
Property checks and council resources →Lambeth
Property checks and council resources →Lewisham
Property checks and council resources →Merton
Property checks and council resources →Newham
Property checks and council resources →Richmond upon Thames
Property checks and council resources →Southwark
Property checks and council resources →Sutton
Property checks and council resources →Tower Hamlets
Property checks and council resources →Waltham Forest
Property checks and council resources →Wandsworth
Property checks and council resources →Westminster
Property checks and council resources →Do driveway gates need planning permission?
Gates, fences and walls can usually be put up without planning permission under permitted development rights, as long as they are no more than 1 metre high where they are next to a road used by vehicles (or the pavement beside it), and no more than 2 metres high elsewhere. Height is measured from ground level. Because a driveway gate almost always faces the road, the 1 metre limit is the one that normally applies, so most full-height driveway gates need a planning application. The Planning Portal guidance on fences, gates and garden walls sets out the national rules.
Permitted development rights do not apply in the same way everywhere. Councils can remove them with an Article 4 direction, which many London boroughs use to protect front boundaries in conservation areas. Taking down an existing front wall or railings in a conservation area can need permission in its own right. Listed buildings need listed building consent for gates and boundary changes, and some newer homes have planning conditions that remove permitted development rights altogether.
Highway rules apply as well as planning. Gates must not open outwards over the pavement or road, so outward-opening gates need to be set back. A new or widened vehicle access needs the council’s approval for a dropped kerb, and trees covered by a tree preservation order can affect where posts and cables go.
If you are unsure whether your gates are permitted development, you can apply to the council for a lawful development certificate. On our survey we check the height, position and opening direction against these rules and tell you whether an application is likely to be needed. Planning decisions rest with your council, so always confirm the position for your own property using the borough resources above.
Not sure if your gates need permission?
Tell us about your property and the gates you have in mind, and we will check the height, position and opening against the rules on our free site survey.
- Free site survey
- Written fixed quote
- No obligation
Prefer to talk? Call 020 3773 1310

